NHS Medical Gas

We treat all our clients with the same high level of care and dedication. However, when installing a system that will save lives for the NHS, there is a heightened level of awareness of what could happen if our work is delayed. Our speed of response and the exceptionally high quality of our teams are two reasons why we work successfully with various NHS organisations.

In 2021, we were contracted to upgrade the medical gas system for ESNEFT (East Suffolk and North Essex NHS Foundation Trust). The work was completed at both their Colchester site (a 763-bed hospital) and their Ipswich site (a 552-bed hospital)

West Suffolk NHS Foundation Trust

In September 2019, Ceetech was awarded the contract to replace the John Godden panel at West Suffolk NHS Foundation Trust.

West Suffolk Hospital has 460-beds. It provides acute services and outpatient facilities including 13 theatres. Based in Bury St Edmunds, Suffolk, the main building was constructed in the 1970s. It is undergoing various works to ensure the building meets current regulations and can continue to provide a safe environment for patient care.

Part of the capital programme of work included upgrading the HV and LV electrical distribution infrastructure. Ceetech won the tender for a £2million project to replace the John Godden panel and associated works.